Hello, welcome to visit Jiangsu Haixin shipping Heavy Industry Co., Ltd. website!
Language:中文 English
Wonderful content loading
1 2 34
  • The Future of Haixin Shipyard

    DATE: 2016-12-25

    The prelude kicked off by Haixin Shipyard for the striving for 200 days came after the dog days of summer. After 1000 tonnage slewing deck floating vessel undocking, Haixin Shipyard made a decisive measure of bringing in the business of ship...

    DETAIL

  • Haixin Shipyard to Strive for the Goal of 200 Days

    DATE: 2016-12-25

    On the morning of 20th, July,the General Manager of Mr. Meng organized the meeting. He proposed the task and goals called fighting 200 days of Haixin Shipyard. Before October, we must complete one being-built vessel and the repair work of...

    DETAIL

  • Haixin Shipyard completed the crucial node for two products

    DATE: 2016-12-25

    As the hot summer approaching,Haixin shipyard encountered a new high tide for production. On July 15th, the node for two products were completed in the same day.1000T full slewing floating crane vesselwas tuged away from the dockyard and ent...

    DETAIL

  • Haixin Shipyard Safely Got Through the Typhoon “Canhong”

    DATE: 2016-12-25

    The typhoon came in full fury and gathered energy and once reached 17 stage(wind speed reached over 60m/s).When the typhoon reached beyond Haimen for almost 1000 km on July 8th,by the guidance of put safety in priority from Mr. Meng xianhong...

    DETAIL

  • Haixin Shipyard to Launch 1000T Revolving Floating Crane Ves

    DATE: 2016-12-25

    On June 18th, Ship owner and Haixin Shipyard shared a grand festival. 1000T Revolving Floating Crane Vessel achieved the launching node, which is a multi-functional special engineering vessel and designed mainly for the emergency rescue and...

    DETAIL

  • HaixinShipyard to Acceleratethe Construction ofRevolving Flo

    DATE: 2016-12-25

    The capsizing of Eastern Star luxury cruise liner not only arouse the national concern, but touched the hearts of Haixin shipyards employees .Currently,the1000T revolving floating crane has entered into the key stage of undocking, which is o...

    DETAIL

  • Haixin Shipyard to Strengthen Cooperation with Foreign Partn

    DATE: 2016-12-25

    The past few days, the senior executives from EPC, a Brazilian renowned construction company, visited Haixin Shipyard. They expressed great appreciation to the under-construction 1000 Tonnage Revolving Floating Crane Vessel and also high int...

    DETAIL

  • Stainless steel pipe welding method

    DATE: 2016-12-25

    Stainless steel pipe welding method Marine reference pipe generally involves the ship crew drinking water security, and so on welding quality in the process of piping fabrication and installation quality is especially important To ensure th...

    DETAIL

  • 海新重工質(zhì)量教育

    DATE: 2016-12-25

    On April 9, 2015, to carry through the company leadership on the high-quality goods factory built fine ships instructions, the quality department Tianguang Xu in the sea new heavy hull workshop, a simple company departments personnel quality...

    DETAIL

  • The completion of dock floor

    DATE: 2016-12-25

    On January 27th, 2015, the pouring of concrete for the last dock floor of the dockyard in Haixin shipyard has been successfully completed, which remarks the node task for the dock floor has been finished and satisfies the basic requirement o...

    DETAIL

  • Copyright 2016-2019 Jiangsu Haixin shipping Heavy Industry Co., Ltd. all rights reserved 蘇ICP備10223514號(hào)-1
    Hotline:0513-82181366 E_mail:jiangsuhaixin@jshxship.com
    Adress:Number 3006 Xianggang Road,Binjiang Street,Haimen City,Jiangsu Province

    ONLINE
    TOP